April 23, 2017:

I’ve been working a heck of a lot of overtime, so I haven’t done much on the dollhouse over the past month. But, I DID finish the stove, and here it is:

I also worked on applying the wood veneer to the kitchen cabinets, which you can see below:

I have to finish the veneer on the cabinet above the fridge, and then I will install the undercabinet lighting strips and then install the wallpaper. After that, I can install the cabinets.

And then—it’s on to the kitchen island and then the countertops!